Manhole Rehabilitation Method Product List and Ranking from 6 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Manhole Rehabilitation Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. アイビルド Fukuoka//Trading company/Wholesale
  2. 日本ステップ工業 Saitama//Building materials, supplies and fixtures manufacturers
  3. トラストテクノ Hyogo//Water supply and drainage construction business
  4. 4 エバタ Tokyo//Trading company/Wholesale
  5. 5 東亜グラウト工業 Tokyo//Other construction industries

Manhole Rehabilitation Method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Sewer Composite Manhole Rehabilitation Method "Eba Sheet Method" 日本ステップ工業
  2. [Construction Technology Examination Certificate] Self-supporting manhole rehabilitation No. 1-4, 10m, suitable for short construction. アイビルド
  3. Sewer Manhole Rehabilitation Method "PML Method" トラストテクノ
  4. 4 Sewer Composite Manhole Rehabilitation Method "Eba Sheet Method" エバタ
  5. 5 Seismic Level 2 compliant, self-supporting manhole rehabilitation method "VertiLiner Method" 東亜グラウト工業

Manhole Rehabilitation Method Product List

1~15 item / All 19 items

Displayed results

Sewer Composite Manhole Rehabilitation Method "Eba Sheet Method"

No special skills required! A sewer composite manhole rehabilitation method that can be constructed with a small road occupancy area.

The "Evashito Method" is a composite manhole rehabilitation technique that involves attaching an "FRP sheet" to the inner wall of an existing manhole that has advanced corrosion, using an expansion frame, and filling the gap between the sheet and the existing manhole with mortar. With a thickness of 1.5mm for the FRP sheet, the method promises increased longevity through enhanced corrosion resistance and durability, while the filling material, a non-shrink mortar, maintains strength over the long term. Additionally, there is no need for heavy machinery, and no special skills are required, allowing for construction in a small road occupancy area. By utilizing the existing manhole, material savings are achieved, resulting in excellent economic efficiency along with shortened construction periods. 【Features】 ■ Demonstrates strong robustness through complete integration with the existing manhole ■ Filling material maintains strength over the long term with non-shrink mortar ■ Can be constructed in a small road occupancy area ■ Achieves material savings by utilizing the existing manhole ■ Passes acid resistance and sulfur intrusion tests *For more details, please refer to the PDF document or feel free to contact us.

  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Technology Examination Certificate] Self-supporting manhole rehabilitation No. 1-4, 10m, suitable for short construction.

A self-supporting manhole rehabilitation method that has received construction technology examination certification maintains strength equivalent to that of a newly installed manhole! Here is an explanation of the construction procedure.

For manholes that require rehabilitation, particularly those that are severely deteriorated and are expected to be unable to maintain the required strength in their current condition, we have developed a rehabilitation method called "SS Hole," which has the same strength as newly installed manholes. 【Construction Procedure】 1. Remove the deteriorated manhole up to the sloped wall. ↓ 2. Clean and remove the vertical walls and invert of the existing manhole. ↓ 3. Install a "reinforced plastic composite pipe" certified by the Sewer Association into the existing manhole (compatible from size 1 to size 4). ↓ 4. Fill the gap between the reinforced plastic composite pipe and the vertical wall of the existing manhole with backfill material. ↓ 5. Install the foundation block for the SS Hole. ↓ 6. Install the slab block for the SS Hole. ↓ 7. After installing the sloped wall, adjustment ring, and iron cover, backfill to complete. *Construction takes approximately 4 to 5 days (depending on conditions).

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting manhole rehabilitation method 'SS Hole System' No. 1 to 4 up to 10m!!

New equivalent load-bearing capacity! A rehabilitation method that simply extends the lifespan of aging manholes.

The "SS Hole System" is a rehabilitation method for manholes that require restoration, particularly those that are severely deteriorated and cannot maintain the required strength in their current condition, or are expected to be unable to maintain strength in the future. This method provides a strength equivalent to that of newly installed manholes. It does not require special materials or construction techniques, and construction can be carried out while the sewage is in use. 【Features】 ■ Compatible with manholes size 1 to 4; other sizes available upon consultation ■ Can accommodate manhole depths of up to 10 meters; depths exceeding 10 meters available upon consultation ■ NETIS registered [QS-150045-A] ■ Simple construction with stable materials produced in a factory ■ Load-bearing capacity is equivalent to new installations 《On March 15, 2019, obtained the Construction Technology Examination Certificate (Sewage) from the Japan Sewerage New Technology Organization, and on March 18, 2021, expanded the scope of application: manholes size 1 to 4, with depths up to 10 meters》 *For more details, please refer to the catalog or feel free to contact us.

  • Manhole body
  • Water Supply Facilities
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-Supporting Manhole Rehabilitation Method SS Hole System

Acquisition of inspection certification! Types 1 to 4! Manhole depth 10m! Construction method using high acid resistance and high load-bearing reinforced plastic composite pipes. No special construction techniques required!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Being self-supporting, it does not require the residual strength from diagnostic surveys of existing manholes and can also accommodate unreinforced manholes, providing a load-bearing capacity equivalent to new installations. This method does not require special construction techniques, allowing for rehabilitation using general construction skills anywhere in Japan. As a factory-produced product, it has consistent quality with no variability and stable load-bearing capacity. The internal cross-section is maximally secured. 【Features】 ■ Constructability: Does not require special construction techniques, allowing for rehabilitation with general construction skills. ■ Acid Resistance: Reinforced plastic composite pipes with over 40 years of proven performance. ■ Load Capacity: Factory-produced, ensuring consistent quality and stable load-bearing capacity. ■ Seismic Resistance: Reinforced plastic composite pipes with high strength and excellent seismic resistance. 《Acquired the Construction Technology Review Certificate (Sewage) from the Japan Sewerage New Technology Organization  March 18, 2021, No. 2021  Scope of expansion: Manholes No. 1 to No. 4, up to a depth of 10m》 *For more details, please refer to the PDF materials or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of standard construction procedures for obtaining inspection certification for self-supporting manhole rehabilitation methods!

No special materials or construction techniques are required, and it can be completed in a short period of about 4 to 5 days! Here is an introduction to the construction procedure of the SS Hall system!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Depending on the conditions, it can be completed in a short construction period of about 4 to 5 days! The construction steps are as follows: 1. Clean and remove the deteriorated sloped walls of the manhole, the vertical walls of the existing manhole, and the invert. 2. Install the "Reinforced Plastic Composite Pipe Manhole" into the existing manhole, filling the gap between the reinforced plastic and the vertical wall of the existing manhole with backfill material. 3. Install the foundation block and slab block of the SS hole, then backfill after installing the sloped walls, adjustment rings, and iron covers to complete the process. 《Construction Technology Examination Certificate (Sewage) obtained March 18, 2021, No. 2021 Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-Supporting Manhole Rehabilitation Method for Construction Consultants

Supports inspection certificates No. 1 to 4 up to 10m! No special construction techniques required! A method using reinforced plastic piping materials with high acid resistance and high load capacity.

The "SS Hole System" is a self-supporting manhole rehabilitation method that simply extends the lifespan of aging manholes. It is widely adopted by construction consultants, construction managers, and civil engineers. This method does not require any special construction techniques, allowing rehabilitation to be performed in any region of Japan using standard construction practices. As a factory-produced product, it has stable load-bearing capacity without quality variations. Additionally, it uses reinforced plastic composite pipes with over 40 years of proven performance, demonstrating high acid resistance and seismic resistance, while also maintaining a slim profile to maximize the internal cross-section. 【Features】 ■ Workability: Can be rehabilitated using standard construction techniques without the need for special skills ■ Acid Resistance: Reinforced plastic composite pipes with over 40 years of proven performance ■ Load-Bearing Capacity: Factory-produced, ensuring stable load-bearing capacity without quality variations ■ Seismic Resistance: High-strength reinforced plastic composite pipes with excellent seismic resistance 《Construction Technology Review Certificate (Sewage) obtained  March 18, 2021, No. 2021  Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10m》

  • Renovation and repair methods
  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] 'Self-Supporting Manhole Rehabilitation Method' No. 1-4, up to 10m!!

Introducing case studies of the self-supporting manhole rehabilitation method "SS Hole System"! Achieving shortened construction periods and quality assurance through the use of factory-produced products!

The "SS Hole System" by Aibuild is a new manhole rehabilitation method that utilizes reliable materials traditionally used, allowing for rehabilitation without relying on the remaining strength of existing manholes. It is designed to meet seismic levels 1 and 2, providing peace of mind! Additionally, its ease of installation makes it applicable in any region across the country. 【Construction Examples】 Client: Fukuoka City Road and Sewer Bureau Construction Year: 2016 Construction Details: Rehabilitation of Manhole No. 3 Manhole Depth: h=2.43m Remarks: SS Hole φ1350, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2017 Construction Details: Rehabilitation of Manhole No. 1 Manhole Depth: h=2.08m Remarks: SS Hole φ800, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2018 Construction Details: Rehabilitation of Manhole No. 3 Manhole Depth: h=3.69m Remarks: SS Hole φ1350, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2020 Construction Details: Rehabilitation of Rectangular Manhole 2000×2000 Manhole Depth: h=6.09m Remarks: SS Hole φ1800, 1 unit *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of standard construction procedures for obtaining inspection certification for self-supporting manhole rehabilitation methods!

No special materials or construction techniques are required, and it can be completed in a short period of about 4 to 5 days! Here are the construction steps for the SS Hall System!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Depending on the conditions, it can be completed in a short period of about 4 to 5 days! The construction steps are as follows: 1. Clean and remove the deteriorated sloped walls of the manhole, as well as the vertical walls and invert of the existing manhole. 2. Install the "Reinforced Plastic Composite Pipe Manhole" into the existing manhole and fill the gap between the reinforced plastic and the vertical wall of the existing manhole with backfill material. 3. Install the foundation block and slab block of the SS hole, then backfill after installing the sloped wall, adjustment ring, and iron cover to complete the process. 《Construction Technology Review Certificate (Sewage) obtained March 18, 2021, No. 2021 Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Technology Examination Certificate: Self-supporting manhole rehabilitation No. 1-4, 10m, suitable for short construction.

A self-supporting manhole rehabilitation method that has received construction technology examination certification maintains strength equivalent to that of a newly installed manhole! Here is an explanation of the construction procedure.

For manholes that require rehabilitation, particularly those that are severely deteriorated and cannot secure the required strength in their current condition, or are expected to be unable to secure strength in the future, we have developed the "SS Hole" as a rehabilitation method that has strength equivalent to newly installed manholes. 【Construction Procedure】 1. Remove the deteriorated manhole up to the sloped wall. ↓ 2. Clean and remove the vertical walls and invert of the existing manhole. ↓ 3. Install the "reinforced plastic composite pipe" certified by the Sewerage Association into the existing manhole (compatible with sizes 1 to 4). ↓ 4. Fill the gap between the reinforced plastic composite pipe and the vertical wall of the existing manhole with backfill material. ↓ 5. Install the foundation block for the SS Hole. ↓ 6. Install the slab block for the SS Hole. ↓ 7. After installing the sloped wall, adjustment ring, and iron cover, backfill to complete. *Construction duration is approximately 4 to 5 days (depending on conditions).

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Rehabilitation of Sewer Manholes

Introducing case studies aimed at the rehabilitation of manholes affected by hydrogen sulfide corrosion.

We would like to introduce a case where "D-Hole (Docking Hole)" was implemented for the rehabilitation of sewer manholes. In the Water and Sewerage Department of the Yakage Town Hall in Okayama Prefecture, measures were being taken for areas where hydrogen sulfide corrosion was significantly advanced. This time, they adopted the D-Hole using the "Cassette Method," which is gaining attention as a new construction method. [Evaluation] ■ Although it was the first adoption, a certain level of effectiveness was confirmed in terms of method, construction period, and cost, so they expressed a positive intention to consider further adoption in the future. *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic Level 2 compliant, self-supporting manhole rehabilitation method "VertiLiner Method"

Overwhelmingly fast construction! Reconstructing and extending the lifespan of concrete corrosion caused by hydrogen sulfide and aging manholes using FRP rehabilitation materials that allow for adjustable wall thickness.

The Bertiliner method is a technique for rehabilitating concrete that has been corroded by hydrogen sulfide and aging manholes using FRP rehabilitation materials. This method consists of FRP rehabilitation materials, a load-bearing ring, and supporting mortar, and the live loads and superimposed loads acting on the manhole are transmitted from the load-bearing ring through the FRP rehabilitation material and then through the supporting mortar to the base slab. Additionally, by using acid-resistant glass fibers and light-curing resins in the rehabilitation material, high-strength rehabilitated manholes can be formed in a short time. The thickness of the FRP rehabilitation material can be designed according to site conditions, allowing for the selection of efficient rehabilitation materials. **Features** - Self-supporting, not relying on the strength of existing manholes - Overwhelmingly fast construction - Integrated rehabilitation of sloped and vertical walls - Complies with seismic levels 1 and 2 **Applications** - Reconstruction and extension of the lifespan of aging or damaged manholes - Types: Prefabricated and cast-in-place - Shapes: Circular Φ900, Φ1000 - Manhole depth: 5m

  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer Composite Manhole Rehabilitation Method "Eba Sheet Method"

Long-lasting corrosion-resistant manholes! A sewer composite manhole rehabilitation method that achieves material savings.

The "Evashito Method" is a composite manhole rehabilitation technique that involves installing an "FRP sheet" on the corroded inner wall of an existing manhole using an expansion frame, and filling the gap between the sheet and the existing manhole with mortar. The backside treatment of the FRP sheet creates a rough surface with the adhered silica sand, enhancing the adhesion strength with the filling material and achieving a complete integration with the existing manhole, resulting in strong durability. No heavy machinery is required, and no special skills are needed, allowing for construction in a small road occupancy area. By utilizing the existing manhole, material savings are achieved, along with a reduction in construction time, making it highly economical. 【Features】 ■ High quality ■ High speed ■ Low cost ■ Can be constructed in a small road occupancy area ■ Achieves material savings by utilizing existing manholes *For more details, please refer to the PDF document or feel free to contact us.

  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting manhole rehabilitation method SS Hall System 1-4 No. 10m!!

Applicable to manholes with reduced residual strength, such as those with cracks!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. It is suitable for manholes with cracks or advanced corrosion, as well as those requiring seismic reinforcement, adapting to manholes with reduced residual strength. This method uses reliable materials that have been traditionally employed, and the rehabilitation material alone provides the strength of a self-supporting pipe, excellent acid resistance, and seismic performance. Additionally, the construction method is simple, allowing all work to be carried out by local contractors. 【Applicable Conditions】 ■ For manholes with cracks ■ For manholes with advanced corrosion ■ For manholes requiring seismic reinforcement ■ For manholes with high hydrogen sulfide concentrations ■ For manholes that cannot be replaced 《Construction Technology Review Certificate (Sewer) obtained  March 18, 2021, No. 2021  Scope of application expanded: Manholes No. 1 to No. 4, up to 10m deep》 *For more details, please refer to the PDF materials or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-Supporting Manhole Rehabilitation Method for Construction Consultants

Supports inspection certificates No. 1 to 4 up to 10m! No special construction techniques required! A method using reinforced plastic piping materials with high acid resistance and high load-bearing capacity.

The "SS Hole System" is a self-supporting manhole rehabilitation method that simply extends the lifespan of aging manholes. It is widely adopted by construction consultants, construction managers, and civil engineers. This method does not require special construction techniques, allowing for rehabilitation in any region of Japan using standard construction practices. As a factory-produced product, it offers consistent quality and stable load-bearing capacity. Additionally, it utilizes reinforced plastic composite pipes with over 40 years of proven performance, demonstrating high acid resistance and seismic resistance, while also maintaining a slim profile to maximize the internal cross-section. 【Features】 ■ Workability: Does not require special construction techniques, allowing for rehabilitation with standard construction practices. ■ Acid Resistance: Reinforced plastic composite pipes with over 40 years of proven performance. ■ Load-Bearing Capacity: Factory-produced, ensuring consistent quality and stable load-bearing capacity. ■ Seismic Resistance: Reinforced plastic composite pipes with high strength and excellent seismic resistance. 《Construction Technology Review Certificate (Sewer) obtained  March 18, 2021, No. 2021  Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》

  • Renovation and repair methods
  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting manhole rehabilitation method SS Hole System

Certification obtained! Types 1 to 4! Manhole depth 10m! Construction method using high acid resistance and high load-bearing reinforced plastic composite pipes. No special construction techniques required!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Being self-supporting, it does not require the residual strength from diagnostic surveys of existing manholes, and it can also accommodate unreinforced manholes, providing a load-bearing capacity equivalent to new installations. This method does not require special construction techniques, allowing for rehabilitation using standard construction practices anywhere in Japan. As a factory-produced product, it has consistent quality and stable load-bearing capacity. The internal cross-section is maximally secured. 【Features】 ■ Constructability: Can be rehabilitated using standard construction techniques without the need for special skills. ■ Acid resistance: Reinforced plastic composite pipes with over 40 years of proven performance. ■ Load capacity: Factory-produced, ensuring consistent quality and stable load-bearing capacity. ■ Seismic resistance: Reinforced plastic composite pipes with high strength and excellent seismic resistance. 《Obtained the Construction Technology Review Certificate (Sewage) from the Japan Sewerage New Technology Organization  March 18, 2021, No. 2021  Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF materials or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration